AFS Featured Projects


Whole Tire Feed System - Sephaku Cement, South Africa

Whole Tire Feed System – Sephaku Cement, South Africa

June 2022, Phase 1 of a whole tire fuel feed system to the backend of the precalciner kiln at the Lichtenberg South Africa plant.  This includes a double gate airlock ...
Whole Tire Feed System - Alpena

Whole Tire Feed System – Alpena

Alpena Plant (Holcim) – Alpena, Michigan, USA (2022-2023) – AFS Technology provided a turnkey fully-automated mid-kiln tire fuel feed system for the Holcim cement plant in Alpena, Michigan. The system ...
Whole Tire Fuel Feed System - Nova Scotia

Whole Tire Fuel Feed System – Nova Scotia

Nova Scotia, Canada (2018) - AFS Technology is providing a fully automated mid-kiln tire fuel feed system for the Lafarge Canada cement plant in Brookfield, Nova Scotia. The system will ...
Whole Tire Fuel Feed System - Guatemala

Whole Tire Fuel Feed System – Guatemala

Guatemala (2018) - AFS is very excited to be a part of this “all new” greenfield cement plant project in Guatemala, which is currently underway and scheduled to be commissioned late ...
Whole Tire Fuel Feed System - Argentina

Whole Tire Fuel Feed System – Argentina

LafargeHolcim Cement Plant - Puesto Viejo, Argentina (2017) - The system was designed to feed whole tires and bagged waste to a Double Gate Airlock Valve with Maintenance Gate mount to ...
Tire Feed System - Oklahoma

Tire Feed System – Oklahoma

Bristow, Oklahoma (2016) - The tire feed system was designed to feed approximately 10 tons per hour of whole tires to the existing manual loading belt conveyor at the plant. The ...
Skewer Suspension Burner - Texas

Skewer Suspension Burner – Texas

Midlothian, Texas (2012) -  AFS was commissioned to provide a turnkey Whole Tire and RDF/PEF Fuel Feed System for Kiln 5 of the TXI, Midlothian Texas Cement Plant. The system was ...
Tire Fuel System - South Africa

Tire Fuel System – South Africa

Simuma, South Africa (2010) – The Whole Tire Feed system designed to automatically feed whole tires to the preheater feed shelf of kiln using a Double Gate Airlock Valve with weight-based ...
Tire Feed System - Romania

Tire Feed System – Romania

Medgidia, Romania (2008) - Whole Tire Fuel Feed System designed to accept tires manually loaded on a conveyor at ground level and automatically feed them to the feed shelves of ...
Tire Feed System - Romania

Tire Feed System – Romania

Hoghiz, Romania (2011) - Automatic tire fuel system with hook elevator and airlock valve. System designed to automatically feed whole tires to the feed shelf of a through an airlock ...
Tire Derived Fuel System - Florida

Tire Derived Fuel System – Florida

Newberry, Florida (2005) - Tire Derived Fuel System (TDF) designed to feed to precalciner kiln and includes trailer tipper, live bottom hopper, tire separator, separation refinement, inspection/rejection, modification of existing elevator, ...
Whole & Chipped Tire System - Puerto Rico

Whole & Chipped Tire System – Puerto Rico

Ponce, Puerto Rico (2010) - System design and equipment for feeding , which includes two trailer tippers, two-stage live bottom hopper 80′ long, sealed live bottom hopper 40′ long, tire ...
Tire Feed System - Texas

Tire Feed System – Texas

Midlothian, Texas (2005) - A complete turnkey whole tire fuel handling system to feed existing long dry kiln. The equipment includes a trailer tipper, live bottom hopper, tire separator, separation ...
Tire Feed System - Alabama

Tire Feed System – Alabama

Demopolis, Alabama (2008) - Whole tire feed system consulting work, in conjunction with Dover Conveyor, provided system design and equipment for feeding whole tires to one 4-stage preheater kiln, which included ...
Mid-Kiln Feed System - Illinois

Mid-Kiln Feed System – Illinois

Grand Chain, Illinois (2003) - A complete turnkey whole tire fuel handling system to feed two existing long dry kilns. The equipment includes a trailer tipper, live bottom hopper, tire separator, ...
Suspension Burning System - Chile

Suspension Burning System – Chile

La Calera, Chile (2006) - This was phase two of a three-phase project for a whole tire suspension burning system for a precalciner of the plants existing cement kiln. This included ...
Tire Feed System - Texas

Tire Feed System – Texas

New Braunfels, Texas (2002) - AFS provided a turnkey, fully-automated whole tire feeding system for a 4-stage preheater kiln. This system included a trailer tipper, live bottom hopper, tire separator, tire ...
Tire Feed System - Oklahoma

Tire Feed System – Oklahoma

Tulsa, Oklahoma (2002) - Turnkey system project, installed in 2001. Provided all equipment and installation, including – mechanical, electrical, civil, and control room interface aspects. The system was designed to feed ...

This Google powered map displays location and information about some of our featured projects around the globe. Check back frequently for new projects added.
For a complete list of AFS projects – click here to contact us