Whole Tire & Bagged Waste Fuel Feed System


LafargeHolcim Cement Plant – Puesto Viejo, Argentina (2017) – The system was designed to feed whole tires and bagged waste to a Double Gate Airlock Valve with Maintenance Gate mount to the east side of the kiln riser duct. The system will be manually loaded at ground level. The system will be designed to feed a maximum of 480 tires or bags per hour (approximately a maximum of 4.5 tph).